Introduction to HiBa in the hall: competition training

Topic
Obstacle course in the hall
Auxiliary means
Barren, Langbank, Malstab, Pauschenpferd, Schwedenkasten, Weichmatte (gross), Weichmatte (klein)
Organization

Single start
Next runner starts as soon as the previous runner has passed the third obstacle

Duration (mm:ss)
15:00
Topic description

The obstacle course in the hall is set up in the specified standard size (volleyball court). All participants complete at least one run for time and thus receive an initial time indication with regard to a possible competition form.

Material

11 colouring sticks
10 soft mats (small)
1 soft mat (large)
3 vaulting boxes
3 long benches
1 parallel bars
2 horses
3 stopwatches
1 flipchart/evaluation sheet (optional for recording times)

QR-Code